Contact Us
Dongguan Changrongjia Mould Technology Co.,Ltd
Contact Person:
Pan Zhixun
Phone No.:
+86 769-87380656/87380676
Mobile:
+86 18925802351
+86 18925802361
Fax:
+86 769-87380628
E-mail:
pat@crmold.com
Website:
www.crmold.com
Address:
No.46 Qingtang Road, Xiani Village, Qingxi Town, Dongguan 523655, Guangdong, China

Pneumatic Handle Hole Puncher And Corner Cutter For Detergent Pouch
It is pneumatic type hole puncher, can punch a handle hole + cut off bag corner for liquid detergent pouch. Usually should be installed on bag making machine and w automatically. Any hole size&shape can be customized.
Product Name: Pneumatic Handle Hole Puncher and Corner Cutter for Detergent Pouch
1. Product Information:
It is pneumatic type hole puncher, can punch a handle hole + cut off bag corner for liquid detergent pouch.
Usually should be installed on bag making machine and w automatically.
Any hole size&shape can be customized.
2. Details of Products
Hole Size&Shape | customized |
Slot Length | 70mm |
Frame Type | C-frame type (one side open,one side closed) |
Punch Speed | up to 150 punches/min |
Net Weight | 12kg |
Power Source | pneumatic type |
Cylinder | AirTAC brand |
Mold Base Material | aluminum alloy |
Die Steels | imported from Japan,durable and precise |
Your Film Thickness | minimum to 40 microns |
Lifetime | up to 18,000,000 to 20,000,000 times |
Precision | ±0.001mm |
EXW Price | USD600-630 |
Exact Price | decided by hole size&shape,passing slot,order quantity,etc. |
MOQ | 1 pcs |
Supply Capacity | more than 1500 pcs/month |
Production Time | 10 working days after payment |
3. Reasons for Choosing Us
(1) Manufacturer with 20-year professional experience
(2) Any hole size&shape can be customized
(3) Fast,precise and long lifetime
(4) Best quality,Best price,Best service for you
4. Product Photos
Please kindly check the hole size&shape, hole direction, slot length and the type of mold frame.
Bag Sample:
5. How to Place Order
(1) Confirm the hole size&shape, slot length, your material and thickness
(2) Confirm the drawing and price
(3) Make PI for payment
(4) Production and delivery
(5) After-sales Service
6. Packaging and Transportation
Usually production needs 10 working days.
Then we can arrange the DHL,FedEx,UPS,TNT,etc for you.
You can also arrange the transportation using your own account.